Powercor Ballarat
B2B PCM was engaged by CitiPower Powercor to carry out infrastructure works to expand the usable area of their existing Ballarat depot. The 16,700m² upgrade included the demolition of existing storage sheds and the construction of a new truck shed, maintenance shed, undercover trailer parking awning and spoil bin containment area. Extensive asphalt resurfacing, stormwater and electrical infrastructure works were carried out across the site, along with the addition of 50 staff car parking spaces. This project enhances the depot’s operational efficiency and capacity, supporting Powercor’s ongoing regional operations.